تخطي للذهاب إلى المحتوى

Kozy Kollar PV-3" Roof Flange

https://nrritvholob.cloudpepper.site/web/image/product.template/8089/image_1920?unique=3b0739c
  • Installes form INSIDE the Building OVER shingles
  • Works on archutechecal and conventual shingles
  • For 3'' PVC, Cast Iron and Copper Pipes
  • Works on flat to 12/12 roof pitches
  • Can be installed in any weather even snow.

349.00 349.0 USD 349.00

غير متوفر للبيع

(349.00 / الوحدات)
  • تاريخ انتهاء الخدمة
  • Brand

هذه التركيبة غير موجودة.

Kitchen & Bath Fixtures
تاريخ انتهاء الخدمة: Sep 2027
Brand: Kozy Kollar

الشروط والأحكام
ضمان إرجاع الأموال خلال 30 يوماً
الشحن: 2-3 أيام عمل

Never Climb a roof to install a pipe flashing. Patented and proven over 200,000 Kozy Kollars have been installed in New England in the last 30 years The Kozy Kollar is the only pipe flashing installed from INSIDE the building OVER shingles. With only three easy steps done in less then 15 minutes there as no reason to climb on a roof again. Step 1; mark the penetration with the supplied template, cut the hole from inside through the plywood and shingles with a reciprocating saw. 2 apply a thin bead of the suppled gasket sealant on the main seal. Pass the Kollar through the hole and set it on top of the shingles. 3 Install the Lower Mounting install and tighten the 7 rod couplings. JOB"S Done